SYSTEM: 2006 Philips 3.0T MRI 16ch Achieva Dual Quasar
Philips ID #
Philips SRN #
MAGNET: F2000, Helium burn off is 1% every 5 days, magnet has never quenched according to Philips
COMPRESSOR: HC-8E
HELIUM LEVEL: 60%
New Style High order Shim
RMMU/MEU: RMMU
DAC: CDAS 16 RF channel
System has multinuclear option installed on it. Was told that it would be removed prior to deinstall.
HOST: HP Z420
SOFTWARE: 5.1.7
RECON: Z400
GRADIENT AMPLIFIERS: Dual 281+ with Gradient Switch
GRADIENT COIL: TNF3 (replaced within the last 12 months)
RF DECK: S26B
WATER: stand along cabinets
TNF2 Gradient coil heat exchanger
Neslab 3 Gradient amplifier heat exchanger
POWER: MDU
COILS:
SENSE 8 Channel Head Coil
3T QHC T/R Head Coil
Intera CTL Spine Coil 5 channel
Intera Torso Array Coil
SENSE FLEX Medium Coil
FLEX Body Coil
The Philips engineer was on site during the inspection and mentioned that the spectro option would be removed prior to the deinstallation. This being said, the system will have to be operational after they remove the spectro options equipment.
The table and covers are in great shape, very little use. The computer was upgraded last year to rev 5 from 3.2.3. The system overall has been a good system. It was used for a lot of research. The cold head was rebuilt 18 month ago.
Return Policy
Items are sold as-is with no returns or refunds available unless explicitly stated.